- We have 250KVA transformer with 70Kva Contract load Electricity Board with a centralized distribution panel for the individual blocks with safety equipment
- As a backbone, we also have 100KW – Diesel Generator
- We have installed a 95Kwp ( Solar Roof Top Photo volatile – Grid Tried System)
- SERAPHIM 315 Wp Solar panels for 95 Kwp
- Good We Inverter of 25Kw of 4 No’s
- For safety installed Lightening arresters, Metal board, inverter earthing.
- Modules are mounted on MS skillion truss type structure with 350 inclination towards under space will be utilized.
- Contract period with Electricity board for 25 years with 9.56 piece per unit.
Solar SRTPV Conclusion – Small Effort towards an environmentally friendly campus.
| Assured units Generation 1500 units Annually/ kW – On an Average,if we consider 1 hour as a power failure per day. – Average generation will be 5 Units /kW. – Average Sunny days will be 310 days in Mysore. |
1,47,250 Units/ Year |
| Savings in CO2emission – Which is equal to planting 402 trees yearly of 14 years age grown to neutralize CO2 in nature | 58 tons annually |